本書以《工程教育認(rèn)證標(biāo)準(zhǔn)》中畢業(yè)要求的“項目管理”能力培養(yǎng)為目標(biāo)導(dǎo)向,在總結(jié)國內(nèi)外項目管理知識體系、標(biāo)準(zhǔn)、規(guī)范、相關(guān)法律的基礎(chǔ)上編寫而成的。本書在介紹工程項目、工程項目管理基本概念的基礎(chǔ)上,詳細(xì)論述了工程項目管理的基本內(nèi)容和方法,主要包括工程項目目標(biāo)與范圍管理、工程項目組織、工程項目計劃、工程項目進(jìn)度控制、工程項目質(zhì)量管理、工程項目施工成本管理、工程項目資源管理、工程項目合同管理、工程項目溝通和沖突管理,工程項目風(fēng)險管理、工程項目流水施工方法和工程項目信息管理等。
本書內(nèi)容豐富,系統(tǒng)性和實用性強(qiáng),既可以作為高等院校工科專業(yè)的工程項目管理課程教材,又可以作為工程管理、土木工程、房地產(chǎn)開發(fā)與管理等專業(yè)的教材,還可以作為工程技術(shù)人員和管理人員學(xué)習(xí)相關(guān)知識的參考書。
吳翔華
----------------------------
吳翔華,南京工業(yè)大學(xué)建設(shè)管理與房地產(chǎn)系教授,博士,南京工業(yè)大學(xué)天誠不動產(chǎn)研究所執(zhí)行所長。南京市房地產(chǎn)學(xué)會會長江蘇省高級人民法院房地產(chǎn)估價專家組成員,江蘇省住建廳房地產(chǎn)估價專家委員會委員,江蘇省住建廳住宅與房地產(chǎn)研究專家委員會成員,注冊房地產(chǎn)估價師、注冊房地產(chǎn)經(jīng)紀(jì)人,中國高校房地產(chǎn)學(xué)者聯(lián)誼會理事。已出版教材9部、專著2部。
第 1 章 緒論 ···································································································· 1
1.1 項目與項目管理······················································································ 2
1.2 工程項目系統(tǒng)基本原理············································································· 7
1.3 工程項目管理系統(tǒng)描述··········································································· 16
1.4 我國工程項目管理的發(fā)展和創(chuàng)新······························································· 25
第 2 章 工程項目目標(biāo)與范圍管理 ······································································· 32
2.1 工程項目目標(biāo)管理················································································· 33
2.2 工程項目范圍管理················································································· 37
第 3 章 工程項目組織 ······················································································ 43
3.1 工程項目組織概述················································································· 44
3.2 工程項目組織結(jié)構(gòu)形式··········································································· 46
3.3 項目團(tuán)隊與項目經(jīng)理·············································································· 53
3.4 工程項目組織溝通················································································· 56
第 4 章 工程項目計劃 ······················································································ 59
4.1 工程項目計劃概述················································································· 60
4.2 工程項目計劃的形式與內(nèi)容····································································· 62
4.3 工程項目計劃的編制·············································································· 65
4.4 工程項目計劃工具——工作分解結(jié)構(gòu)························································· 67
第 5 章 工程項目進(jìn)度控制 ················································································ 72
5.1 工程項目進(jìn)度控制概述··········································································· 73
5.2 工程項目進(jìn)度控制措施··········································································· 75
5.3 工程項目進(jìn)度計劃的編制········································································ 79
5.4 工程項目進(jìn)度的檢查與分析方法······························································· 96
5.5 工程項目進(jìn)度計劃的調(diào)整與優(yōu)化······························································ 100
第 6 章 工程項目質(zhì)量管理 ················································································ 105
6.1 概述·································································································· 106
6.2 質(zhì)量管理體系······················································································ 113
6.3 工程項目施工質(zhì)量控制·········································································· 116Ⅳ
6.4 工程質(zhì)量事故的分析與處理···································································· 123
6.5 工程質(zhì)量控制的數(shù)理統(tǒng)計方法································································· 131
6.6 工程項目質(zhì)量驗收················································································ 138
第 7 章 工程項目施工成本管理 ········································································· 144
7.1 概述·································································································· 145
7.2 施工成本計劃······················································································ 152
7.3 施工成本控制······················································································ 157
7.4 施工成本分析······················································································ 166
第 8 章 工程項目資源管理 ··············································································· 172
8.1 工程項目資源管理概述·········································································· 173
8.2 工程項目人力資源管理·········································································· 176
8.3 工程項目材料管理················································································ 181
8.4 施工項目機(jī)械設(shè)備管理·········································································· 186
第 9 章 工程項目合同管理 ··············································································· 189
9.1 合同基礎(chǔ)知識······················································································ 190
9.2 工程項目合同管理概述·········································································· 202
9.3 工程項目合同的分類與選擇···································································· 202
9.4 工程項目合同管理內(nèi)容·········································································· 204
9.5 工程項目合同索賠管理·········································································· 206
第 10 章 工程項目溝通和沖突管理 ···································································· 209
10.1 工程項目溝通管理 ·············································································· 210
10.2 工程項目沖突管理 ·············································································· 217
第 11 章 工程項目風(fēng)險管理 ············································································· 222
11.1 工程項目風(fēng)險管理概述 ········································································ 223
11.2 工程項目風(fēng)險識別 ·············································································· 225
11.3 工程項目風(fēng)險評估 ·············································································· 229
11.4 工程項目風(fēng)險應(yīng)對 ·············································································· 231
11.5 工程項目風(fēng)險監(jiān)控 ·············································································· 235
第 12 章 工程項目流水施工方法 ······································································· 237
12.1 流水施工原理 ···················································································· 238
12.2 流水施工的組織方式 ··········································································· 247
12.3 工程項目流水施工進(jìn)度計劃 ·································································· 252
12.4 現(xiàn)代穿插流水施工的組織 ····································································· 256
第 13 章 工程項目信息管理 ············································································· 262
13.1 概述 ································································································ 263
13.2 工程項目管理信息系統(tǒng) ········································································ 268
13.3 現(xiàn)代信息技術(shù)在工程項目管理中的應(yīng)用 ··················································· 273
參考文獻(xiàn) ······································································································· 278